品管圈在提高全自动摆药机分包前流程效率中的应用
x

请在关注微信后,向客服人员索取文件

篇名: 品管圈在提高全自动摆药机分包前流程效率中的应用
TITLE:
摘要: 目的:提高全自动摆药机分包前流程效率。方法:成立住院药房品管圈,按照品管圈活动步骤,找出影响全自动摆药机分包前流程效率的关键环节、关键因素,针对要因制定相应对策并实施,再通过对品管圈活动实施前后的分包前流程用时等指标对本次活动进行评价。结果:针对分包前流程用时最长的2个工作环节即“去除药品外包装”和“人工统计制订加药单”,通过采取准确设定加药数量及品种、定时盘点摆药机、及时调整摆药机药品目录、加强培训等措施提高了工作效率,全自动摆药机分包前流程用时由活动前的179.8 min缩短至活动后的119.2 min(缩短33.7%),目标达成率为168.5%;且QCC活动成员在品管手法、责任心和团队凝聚力等方面均正向增长(增长率为15%~81%)。结论:品管圈活动提高全自动摆药机分包前流程效率的效果显著。
ABSTRACT: OBJECTIVE: To improve the process efficiency of automatic dispensation machine before dispensing. METHODS: After building quality control circle (QCC) in the hospital inpatient, according to the steps of QCC, the key links and factors that affect process efficiency of automatic dispensation machine before dispensing were found out, corresponding countermeasures were developed based on causes, then it was evaluated by process time and other indexes in dispensing before and after the development of QCC. RESULTS: The 2 links (removing the drug packaging, manually counting and developing add-drug list) with the longest time before dispensing improved work efficiency by setting add-drug quantity and variety truly, timing checking dispensation medicine, timely counting dispensation medicine drug list, strengthening training and other methods, process time of automatic dispensation machine before dispensing was shortened from 179.8 min (before) to 119.2 min (after) (shortened by 33.7%), target achievement rate was 168.5%; and QCC staff showed positive growth in means, responsibility, team cohesion, and other aspects (increase rate were 15%-81%). CONCLUSIONS: QCC shows obvious effect on improving process efficiency of automatic dispensation machine before dispensing.
期刊: 2017年第28卷第13期
作者: 蔡卓倩,宋惠珠,杨华,陈佳钢
AUTHORS: CAI Zhuoqian,SONG Huizhu,YANG Hua,CHEN Jiagang
关键字: 品管圈;摆药机;分包前流程;效率
KEYWORDS: Quality control circle; Dispensation machine; Process before dispensing; Efficiency
阅读数: 361 次
本月下载数: 12 次

* 注:未经本站明确许可,任何网站不得非法盗链资源下载连接及抄袭本站原创内容资源!在此感谢您的支持与合作!